You will be asked two questions in these Analytical
techniques for supply chain management Assignment. Each question is worth 45
marks. The questions are
constructed in a way that you get a chance to revisit the models
and tools we have learned in class. While the supply chain context of the
questions remains the same, each student has a dataset prepared for themselves
to avoid high similarity rates on Turnitin. Please limit your submission to
1,000 – 3,000 words.
Analytical Techniques For Supply Chain Management Assignment –
Cranfield University UK.
You can achieve the variable capacity of a operation
by employing part-time personnel. Part-timers are paid less per
hour than full-time employees. Other considerations, however, may limit the
extent to which part-time workers can be hired in a given part of the Design
and Print Studio. The problem is to find an optimum workforce schedule that
would meet personnel requirements at any given time whilst being economical.
Some of the factors affecting personnel assignment are listed here:
* Full-time workers work 8 hours per day, plus an
hour break. lunch.
About half of full-time workers eat between 12pm
and 13pm. the remaining go between 1 pm to 2 pm.
* Part-timers must work at least three hours per
day. No more than 5 continuous hours per day and are not allowed a
lunch break.
Part-time employees are not eligible for overtime
pay. Limited to a maximum of 40% of the day’s total requirement.
For example, if the total personnel hours required over a day are 100 hours,
then at most 40 hours of this could be met by part-time personnel. This is a
policy generally applied to ensure high ownership of the service business.
* The shift begins at 9am and ends at 7pm (i.e. overtime
is limited to 1 hour). Any work left over at 7 pm is considered a backorder for
the next day.
He or she is entitled to one hour per day of
overtime pay for full-time employees. He
or she is paid 1.5 times the normal rate typically applicable to
overtime hours.
Comments
Post a Comment